Business Problem
In a difficult situation with a customer, a client
needed to show their software product’s value
quickly. The software product was underperforming and
not meeting the client's stated claims.
Analysis by BlueSteel identified inadequate compute
and storage resources to be the issue. BlueSteel's
solution called for a high capacity, state-of-the-art
compute server with large, high-speed disk storage
directly attached be installed and configured in the
client's customer's IT server room. BlueSteel's client
agreed and insisted the task be completed and
successful with four days. The challenging request was
further complicated by the distance between the
client's facilities on the East Coast and the
customer's site in California. The client was unable to
procure a server from traditional suppliers that met
the requirements within the time frame and at an
affordable cost.
Challenges
- Deliver high performance and lower
cost than traditional suppliers. The
customer’s best servers were configured with
4CPUs and 16GB RAM; however, client needs required a
16CPU 256GB RAM server to properly show their product
strength.
- Network latency created a data
access bottleneck. Local disc access to the compute
server was required. The client's product achieved
peak performance when access to data scaled with CPU
count.
- Fast response time to achieve
on-Site installation and configuration at the
client’s customer site within 4 days.
- Establish working IT
relationship with the client's customer IT
department to install and configure the server on
their network. The client's product required
configuration and integration to function
properly.
BlueSteel Solution
After understanding the client's needs, BlueSteel
contacted an OEM hardware vendor to build the solution.
BlueSteel flew to the OEM vendor’s location to
observe the build, perform the configuration, and test
the solution. Once successful testing completed,
BlueSteel hand-delivered the the solution to the
customer's location. A strong relationship of mutual
respect and trust was quickly built with the customer's
IT department, once the solution was installed,
configured, and in production in less than four
hours.
- Achieved cost target including
hardware, software, service and travel. Solution was
delivered in 4 days, as contracted.
- Validated product claims of the
client in the customers production environment.
Client was able to provide superior support and
differentiate their solution.
- Built strong IT relationship
with the customer. BlueSteel was able to gain the
respect and trust of the customer's IT department by
demonstrating professional courtesy, domain insight,
and dogged attention to detail.
Client Value
- Cost savings were achieved over
traditional suppliers, who were unable to fill the
order at a reasonable cost. BlueSteel built the
server from scratch, tested the server to ensure
client's claims were substantiated, and delivered the
server to the customer's site on time. The entire
solution was a 65% savings over the best quote the
client received.
- Competitive advantage was
achieved through the solution. The client was able to
prove their product’s value, and in addition
was able to differentiate their support from the
other vendors in the sales cycle.